ENDGAME BLUEPRINTS Part 4

CRS Cardiac Remediation Station & Updated Facilities

Last updated: 2026-04-17

* TL;DR - Key Points

  • * CRS produces Hetonite Components -- For new gear sets + SC Batteries at 12/min
  • * Conduit setup critical -- Top 2 = Water, Bottom = Acid; TWO pumps ALWAYS
  • * Dump Acid properly -- From Purification Unit to Fluid Supply Unit
  • * CRS pt A updated -- Now uses Yazhen plants; old versions outdated
  • * SKF + Wuling updates NECESSARY -- New conduit lines for Yazhen plant creation
  • * Manage output manually -- Set SubPAC for Heavy Xiranite and Hetonite Parts
  • * Sell caps first -- Heavy Xiranite and Hetonite Parts can cap out; sell before overcap

📐 Endgame Blueprint Series

Complete factory blueprint collection for endgame production optimization

Overview

Cardiac Remediation Station (CRS)

Advanced T3 material production facility creating Hetonite Components for new gear sets while maintaining 12/min SC Battery production. Requires careful liquid management and conduit setup.

  • * Hetonite Components: Variable rate
  • * Heavy Xiranite Parts: Variable rate
  • * SC Batteries: 12/min
  • * Requires: Area Expansion II, Depot Bus
  • * Liquid Management: 2 Water + 1 Acid conduits
  • * SubPAC Output: Manual configuration required

Updated Facilities

SKF ver 1.2 and Wuling ver 1.2 pt A include critical updates for Yazhen plant integration. These modifications are NECESSARY to support the new Area expansions and CRS operations.

  • * NEW Conduit Lines for Yazhen
  • * Yazhen Syringe Creation (SKF)
  • * Cuprium Parts Production (Wuling)
  • * Ferrium Bottle Transfer (Valley IV)
  • * 3 Water Conduits Required

Critical Setup Notes

Conduit Manifold Inlets

Have TWO pumps going in ALWAYS. Never run single pump to manifold inlets.

Yazhen Plant Requirement

If your CRS pt A doesn't use Yazhen, you're using an outdated version.

Acid Disposal

Dump Acid from Purification Unit into Fluid Supply Unit.

Sell Before Cap

Heavy Xiranite and Hetonite Parts should be sold before capping.

Cardiac Remediation Station (CRS)

The CRS is your endgame T3 material production hub, creating Hetonite Components for new gear sets while maintaining SC Battery production. Proper liquid management is critical.

Sky King Flat ver 1.2

Updated SKF facility with NEW conduit lines for Yazhen plant creation. This update is NECESSARY to go along with the new Area expansions.

Critical Changes in ver 1.2

  • * NEW CONDUITS REQUIRED -- Setup to create Yazhen plants (used with CRS pt A)
  • * Ferrium Bottle Transfer -- Using bottles from Valley IV instead of raw ore
  • * Yazhen Syringe Creation -- Now integrated into production flow
  • * Outdated Version Warning -- If your CRS pt A doesn't use Yazhen, update immediately

Wuling ver 1.2 pt A

Updated Wuling facility with optimized Cuprium production split. One facility makes Cuprium Bottles, another makes Cuprium Parts for Yazhen Syringe Creation.

Key Updates

  • * 3 Water Conduits -- Basic conduit setup required
  • * Cuprium Split Production -- Bottles vs Parts (Parts for Yazhen Syringes)
  • * SKF Modifications Necessary -- Must update both facilities together
  • * Conduit Reference Images -- Check supplementary images for routing

Complete Setup Guide

1 Expansion Requirements

  • * Unlock CRS Expansion I and Expansion II
  • * Unlock Wuling Depot Bus
  • * Add Depot Bus Section (once, only necessary)
  • * FULLY UNLOCK WULING AIC II skill tree

2 SubPAC Relocation

  • * Move the SubPAC into the Bottom Left of the map
  • * This provides optimal access for material routing
  • * Ensures proper flow for Hetonite and Heavy Xiranite outputs

3 Conduit Connections (CRITICAL)

  • * Top 2 Conduits are Water
  • * Bottom Conduit is Acid
  • * TWO pumps going in ALWAYS for Conduit Manifold Inlets
  • * DO NOT supply more than 2 facilities per water source

4 Acid Disposal

  • * Dump the Acid from Purification Unit in a Fluid Supply Unit
  • * This step is often missed but critical for operation
  • * Check supplementary images for proper setup

5 SubPAC Output Configuration

  • * Set the output of the SubPAC manually
  • * Configure for: Heavy Xiranite Parts and Hetonite Parts
  • * Monitor output caps and sell before overcap

6 Yazhen Plant Integration

  • * CRS pt A updated to use Yazhen plants
  • * NEW conduit lines needed for Yazhen creation
  • * SKF ver 1.2 handles Yazhen Syringe creation
  • * Wuling ver 1.2 pt A provides Cuprium Parts for syringes

Important Warnings

  • * Heavy Xiranite Cap -- Ideally don't let this cap out (sell first)
  • * Yazhen Syringe Cap -- Ideally don't let this cap out either (sell first)
  • * Need Hetonite Parts? -- Turn off New Gear Unit Component creation in CRS temporarily
  • * Outdated Blueprint Warning -- If CRS pt A doesn't use Yazhen, you're using old version

Frequently Asked Questions

What is the Cardiac Remediation Station (CRS)?

CRS is an advanced production facility that creates Hetonite Components for new gear sets and Heavy Xiranite Parts. It produces SC Batteries at 12/min while also generating valuable T3 materials. The station requires careful liquid management with Water and Acid conduits.

Why does CRS pt A use Yazhen plants?

The updated CRS pt A blueprint uses Yazhen plants for optimized production. If your CRS pt A doesn't use Yazhen, you're using an outdated version. This change improves material flow and efficiency in the remediation process.

How do I connect the conduits for CRS?

CRS requires 3 conduit connections: Top 2 conduits carry Water, and the Bottom conduit carries Acid. Make sure to have TWO pumps going in ALWAYS when using Conduit Manifold Inlets. Never supply more than 2 facilities per water source.

What do I do with the Acid from the Purification Unit?

You must dump the Acid from the Purification Unit into a Fluid Supply Unit. This is a critical step that's often missed. Failure to properly route the Acid will cause production bottlenecks.

Why are SKF modifications and Wuling updates necessary?

The new Area expansions require updated conduit setups to create Yazhen plants. SKF ver 1.2 and Wuling ver 1.2 pt A include the necessary infrastructure changes to support CRS operations and Yazhen Syringe creation.

What's the difference between Cuprium Bottles and Cuprium Parts?

In Wuling ver 1.2 pt A, one Cuprium facility makes Cuprium Bottles while another makes Cuprium Parts. The Cuprium Parts are specifically used for Yazhen Syringe Creation in SKF ver 1.2. Manage these separately in your inventory.

Do I need to sell Heavy Xiranite and Hetonite Parts?

Ideally, don't let these cap out - sell first to maintain production flow. However, if you need spare Hetonite parts (e.g., for new Combat Facilities), you can turn off the New Gear Unit Component creation in CRS temporarily.

What operators should I use for CRS operations?

Use operators with bonus Production Speed and Material efficiency. Since CRS produces high-value T3 materials, prioritize operators that reduce production time and increase output quality.